HANDLEBAR ORDERING
Ordering from Perry Titanium is simple. Please make your initial enquiry through our contact page. We will then get back in touch by email and call to discuss your enquiry. The design and build process is as follows:
1) The standard handlebar dimensions are shown on the diagram on the Handlebar products page and are kept as stock items. Provided these dimensions are acceptable the handlebar can be despatched within 5 working days of receiving full payment.
2) If your handlebar uses non standard dimensions please contact Perry Titanium with your dimensions.
3) Perry Titanium will then produce a working drawing of your handlebar for you to sign off to ensure we have interpreted your instructions correctly. A 50% first deposit is required by bank transfer prior to producing the drawing. The drawing will be produced and emailed to you within 5 working days.
4) Once you have signed off the drawing you will then need to pay the remaining 50% balance of the handlebar cost by bank transfer and the handlebar will then go into manufacture.
5) Once in manufacture it is not possible to change the handlebar dimensions. Non standard handlebars take two weeks to manufacture and despatch but if we can produce it sooner we will.
6) Titanium tubing is expensive stuff to waste! Once the handlebar has gone into manufacture and material is cut any cancellation of your order will result in retention of the 50% first deposit to cover the cost of our time and wasted materials.
Ordering from Perry Titanium is simple. Please make your initial enquiry through our contact page. We will then get back in touch by email and call to discuss your enquiry. The design and build process is as follows:
1) The standard handlebar dimensions are shown on the diagram on the Handlebar products page and are kept as stock items. Provided these dimensions are acceptable the handlebar can be despatched within 5 working days of receiving full payment.
2) If your handlebar uses non standard dimensions please contact Perry Titanium with your dimensions.
3) Perry Titanium will then produce a working drawing of your handlebar for you to sign off to ensure we have interpreted your instructions correctly. A 50% first deposit is required by bank transfer prior to producing the drawing. The drawing will be produced and emailed to you within 5 working days.
4) Once you have signed off the drawing you will then need to pay the remaining 50% balance of the handlebar cost by bank transfer and the handlebar will then go into manufacture.
5) Once in manufacture it is not possible to change the handlebar dimensions. Non standard handlebars take two weeks to manufacture and despatch but if we can produce it sooner we will.
6) Titanium tubing is expensive stuff to waste! Once the handlebar has gone into manufacture and material is cut any cancellation of your order will result in retention of the 50% first deposit to cover the cost of our time and wasted materials.